 | Location: Bakersfield, CA Contractor: Colombo Construction Square Footage: 222,000 Tons: 449 |
Kern Steel fabricated and erected the 12 different buildings at this High School. Each building was designed to the subject discipline to be taught. Frontier High School is designed to house 2,200 students. In the construction of this High School both steel as well as wood were used. |